| Quincy
• Page 2 |
||||||||||||
| 12/07-09,
2002 |
Next Pages: 1-2-3-4-5-6-7-8-9-10- | |
||||||||||
| Back to First Page | ||||||||||||
| |
Winter 2002 Works: | |||||||||||
|
|
|
|||||||||||
![]() |
![]() |
|||||||||||
Original
loft and stairways before Jarda Stehlik built a railing (see next
page). |
||||||||||||
Old
planters (on the right) got removed and another new railing was built
instead (photo page
4). |
||||||||||||
![]() |
||||||||||||
![]() |
||||||||||||
| Wood
stove will be moved to the concrete block wall on the left; the wall will
be finished with stones and
the floor with mexican tiles (in Spring 2003?). Loft Toilet aka "Kadibudka" |
||||||||||||
New
toilets were
installed and tested in the entire
house (one in this "Kadibudka" on the loft,
one
on the main floor
and one in the basement).Upper Rear Porch |
||||||||||||
| Most
junk from the areas under the porches is going to a local dump to make space
for a firewood storage. Basement |
||||||||||||
Basement
currently serves as a depot for water tank and solar system elements. The
old carpet got removed; more stuff is waiting to be dumped; Old Hot Tub and Swimming Pool Area |
||||||||||||
|
||||||||||||
|
||||||||||||
| XXXXXXXXXXXXXXXX |
||||||||||||